The Big Build

IMG_4053

Renovation of our 1930’s semi in North London. Work started May 2017.

The ‘Before’s’…

IMG_3931

Hoarding is up, and demolition of the garage started…someone quite likes the JCB!

We now have our very own bridge!! and lots of mud…the kids loved digging for bits of ceramics and ‘treasure’…how did it all get there?!

Foundations dug, and steels/cement going in…Mr A surveys the work in progress!

June – we move out, brickies move in

Demolition of my poor kitchen….aarrgghhhh!

IMG_4501

Meanwhile, out the front tons of sand has been delivered and a lot of rubbish is piling up!

Demolition of the kitchen/dining room wall continues inside, and the back extension is built

July – hoarding comes down, crap is cleared, ground flattened and concrete poured!

Scaffolding goes up…time for the roof to come off…scary!!

Work begins internally upstairs…

Its summer, yet we have rain…and we have puddles arrgghhhh!

August- loft in progress internally

Loving the amazing view from the loft!!

Back downstairs, the black bi-fold doors and windows are installed…nice

September – loft insulation, velux windows & plaster board installed

Plasterboard going up on walls downstairs too….

Underfloor heating laid, and flooring screed

Lovely massive sliding windows fitted in loft- woohoo!

October – ‘Diy Kitchens’ kitchen delivered and fitted

After much discussion we finally opted for monochrome BCT ‘Henry’ tiles for the kitchen area.

Upstairs, the loft ensuite is being tiled (more BCT tiles) and Vitra bathtub plumbed in.

We now have a new brick wall out the front…

IMG_7831

…and lights/ new grey patio slabs out the back.

Marble-effect granite worktop and Carron Phoenix stainless steel sink installed.

November – lots of plastering, sanding and painting…plus the little loo is taking shape.

Bespoke dressing room and storage in the loft under construction.

IMG_7748

LED spotlights going in everywhere.

The new ensuite’s are taking shape with Mira digital showers and Vitra Nest basins & bogs!

IMG_7851

Due to finish in 2 weeks time but still so much to do?!!

December – Our bedroom & bathroom are being used as a dumping ground…bedroom ceiling has been repaired (where water came through roof in July!), and painted.

Sam’s bedroom ceiling finally plaster- boarded after the rain came through roof in July! Mia’s room nearly finished.

IMG_8025

Will we be home for Christmas….I’m not so sure, so I’ve started packing a few festive essentials like Christmas jumpers and hats!

Our lovely Heals ‘Olson’ smoked glass pendant lights are hung and ‘Whirly Willis’ bulbs fitted in the kitchen.

December 10th – Snow!!! Mr & Master Attaway brave the snowy hills on their bikes to check up on things at home…

Kitchen tiles look amazing! Really pleased we finally found the diamond shape we’d seen on Pinterest. Seems that Tiles Direct are the only UK stockist!

IMG_8341

w/c 18th December – week before Christmas!! ‘Snug’ wall is finally painted, and final adjustments made to kitchen

Cloakroom is papered with ‘Nautilus’ and loft ‘Woods & Stars’ both by Cole & Son

22nd December –  Carpet day!! We chose Crown Flooring’s ‘Satino Exquisite’ in Anthracite, so soft and velvety

24th December…Twas the night before Christmas and all through the house not a creature was stirring, not even a builder!! They have cleaned up and left for a well-deserved Xmas break

31st December – Moving in day! Still lots to finish off but its habitable at last!

New super king bed from Benson’s was delivered in the week and it looks and feels amazing!! Just need new super king bedlinen now

January 2018 – the boys have made themselves at home 🙂

suzie 2

February 2018 – Dining table and sofa have arrived- yippee! House is finally beginning to feel like a home

suzie 9

Choosing a colour to paint the downstairs loo

suzie 11

suzie 17

Mia’s acquired some pet fish since we moved back

IMG_9076

March 2018 – snow day!

 

Advertisements